Ask ten buyers what size machine they need and most will answer with a number of tons. That number matters, but it is only the start. Clamping tonnage tells you how hard the machine can hold a mould shut against injection pressure. It does not tell you whether the mould will fit between the tie-bars, whether the barrel can fill the cavities, or whether the screw can plasticize enough material for your cycle. This guide walks through a practical method to estimate injection moulding machine tonnage from your part or mould, then the four checks that decide whether a machine of that size is actually the right one.
Tonnage is clamp force, not part weight
Injection moulding machine tonnage is the clamping force the machine applies to keep the two halves of the mould closed while molten plastic is injected under high pressure. A 250-ton machine can hold the mould shut against roughly 250 tonnes of force trying to push it open.
That opening force comes from melt pressure acting over the area of the part as seen from the direction the mould opens. This is why tonnage is driven by projected area, not by how heavy the part is. A thin, flat lid and a thick, compact block can weigh the same and need very different clamp forces.
Getting the clamp wrong costs money either way:
- Too little clamp force: the mould "breathes" during injection. Melt escapes at the parting line as flash, parts need trimming or are rejected, and the processor is forced to cut injection pressure, which brings short shots and sink marks.
- Far too much clamp force: you pay for a bigger machine, more floor space and more energy than the job needs. On a small mould, excessive clamp can also load the mould and platens harder than necessary and squeeze vents shut, which causes burn marks and trapped air.
The goal is a clamp figure with a sensible margin, not the largest machine in the budget.
A worked method to estimate clamping force
The common rule of thumb is simple:
Clamping force (tonnes) = Projected area (cm²) × Clamp factor (t/cm²) × Reserve
Work through it in three steps.
Step 1: Find the total projected area
Projected area is the outline of the part as seen looking straight into the mould along the opening direction. Holes that go right through reduce it; ribs and walls running parallel to the opening direction do not add to it.
Add up:
- the projected area of every cavity in the mould, and
- the projected area of the cold runner and sprue system, if there is one. On a hot-runner mould the runner sits inside the manifold and is normally left out.
Step 2: Apply a clamp factor for the material and part
Industry guides usually express the clamp factor as about 2 to 5 tons per square inch, which is roughly 0.3 to 0.8 tonnes per square centimetre. Where your part sits in that band depends on:
- Material flow. Easy-flowing materials such as PP and PE sit towards the lower end. Stiffer, more viscous materials such as PC, filled nylons and other engineering grades need more.
- Wall thickness and flow length. Thin walls and long flow paths need higher injection pressure, which pushes the factor up. Thin-wall packaging is the classic high-factor case.
- Part geometry and gating. Deep parts, many cavities fed from one point, or high holding pressure all raise the figure.
These are general starting ranges, not Futech-specific values. Your material supplier's datasheet and your mould maker's experience with similar tools should refine them.
Step 3: Add a modest reserve
Add a margin of around 10 to 20% for process variation, so you are not running the machine at the very edge of its clamp rating.
Example
A four-cavity mould for round container lids, each lid 150 mm in diameter, moulded in PP with a cold runner:
| Item | Working |
|---|---|
| Projected area of one lid | π × 7.5 cm × 7.5 cm ≈ 177 cm² |
| Four cavities | 4 × 177 ≈ 707 cm² |
| Cold runner (estimate) | ≈ 30 cm² |
| Total projected area | ≈ 737 cm² |
| Clamp factor (PP, fairly thin wall) | 0.4 t/cm² (assumed for this example) |
| Base clamp force | 737 × 0.4 ≈ 295 t |
| With 10% reserve | ≈ 325 t |
So this job points to a machine of roughly 320–350 tons. Move to a thinner wall or a stiffer material and the factor, and therefore the tonnage, rises. This is an illustration of the method only. Use your own part data and confirm the figure with your mould maker or a machine applications engineer.
Four checks after you have a clamp figure
A machine with the right tonnage can still be the wrong machine. Before shortlisting, check these four points.
1. Shot capacity
The barrel must deliver the full shot: all cavities plus runner. Shot capacity is usually quoted as shot weight in polystyrene (PS), so convert for your material's density. A common working guideline is to use roughly 20 to 80% of the barrel's shot capacity. Too small a shot in a large barrel leaves melt sitting at temperature for many cycles and can degrade it. Too large a shot leaves no margin for packing.
2. Tie-bar spacing and platen size
The mould has to physically pass between the tie-bars (on machines that have them) and sit on the platen with its clamping slots reachable. A compact multi-cavity mould and a wide automotive tool can need the same tonnage but very different platen sizes. Check horizontal and vertical tie-bar spacing against the mould's outside dimensions, not just the cavity layout.
3. Mould height and opening stroke
Every machine has a minimum and maximum mould height (shut height). Your mould must fall inside that window. The opening stroke, or daylight, must then be long enough to open the mould and eject the part. A useful rule is that deep parts need an opening stroke of at least about twice the part depth plus clearance for ejection, and more if a robot or picker has to reach in.
4. Plasticizing rate versus cycle time
The screw must melt the next shot during the cooling time of the current one. Divide the shot weight by your target cycle time to get the hourly material throughput the screw has to deliver, then compare it with the machine's plasticizing rate for your material. A machine with ample clamp but a slow screw will set your cycle time instead of the mould.
How the application shifts the starting point
The same method applies to every part, but the starting point shifts by application:
- Thin-wall packaging, caps and closures. High injection speed and pressure push the clamp factor towards the top of the range. Fast dry cycles, a responsive clamp and good plasticizing matter as much as tonnage.
- General technical and household parts. Mid-range factors usually apply. Mould fit, flexibility for different tools and stable repeatability tend to drive the decision.
- Large automotive and industrial parts. Projected areas are large, so tonnage climbs quickly, but mould size, weight and opening stroke often become the limiting factors before clamp force does.
Where a 75–4000T range fits
Futech's injection moulding machines run from 75 to 4000 tons clamping force, with different clamp designs across that span. Once you have a clamp figure and have done the four checks, the clamp type for the application helps narrow the choice. The series below are examples of clamp type and range only. Model-level platen, shot and stroke data should come from the sales team for your mould.
| Series | Clamp type | Clamping force |
|---|---|---|
| FORZA | Servo hydraulic, direct-lock (ram-type) | 75–410T |
| XENON | Servo hydraulic toggle | 110–550T |
| FT | Toggle | 110–1350T |
| TP | Two-platen | 650–4000T |
| ES | All-electric | 120–450T |
You can compare all of them on the injection moulding machines page.
When to talk to an applications engineer
Work out the numbers yourself, but involve an engineer when:
- your result falls between two machine sizes,
- the part is thin-wall, very long-flow or in an engineering material you have not run before,
- the mould is large, heavy or very tall for its tonnage, or
- you plan to add a robot, inserts or in-mould labelling.
Rounding up "just in case" is rarely the cheapest answer. A machine sized to the real job, with a sensible reserve, usually wins on energy, floor space and cycle time.
For a broader view of machine selection, see our guide to choosing the right injection moulding machine for your production and the complete guide to plastic injection moulding machines.
Frequently asked questions
Can I size an injection moulding machine from part weight alone?
No. Part weight tells you about shot capacity, not clamp force. Clamping tonnage depends on projected area, wall thickness, material and flow length. Two parts of the same weight can need very different tonnage, so calculate both the clamp force and the shot size.
What is the rule of thumb for clamping force?
A common starting point is about 2 to 5 tons per square inch of projected area, roughly 0.3 to 0.8 tonnes per square centimetre, depending on material and wall thickness, plus a reserve of around 10 to 20%. Treat it as an estimate to be confirmed with your mould maker or machine supplier.
What if I already have the mould?
Then measure the mould rather than the part. Check its outside dimensions against tie-bar spacing and platen size, its shut height against the machine's mould height range, and the opening stroke needed to eject the part. Share the mould drawing and the part data with the supplier so they can confirm the fit.
Should I buy a bigger clamp for future jobs?
Only if you have real, specific future moulds in mind. Extra clamp you never use costs more to buy and run. It is often better to size for your current and near-term moulds and choose a machine with suitable tie-bar spacing and opening stroke for the tools you expect next.
Does the number of cavities change the tonnage?
Yes. Clamping force scales with the total projected area of all cavities plus any cold runner. Doubling the cavities of the same part roughly doubles the clamp force needed, and it also increases the shot size and the plasticizing rate required.